KLT were proud to successfully bid and secure the mains and service replacement works at Alexandra Palace. The work consisted of multi diameter mains and various domestic and non – domestic services, along with the reinstatement and waste haulage was completed ahead of schedule and to the highest possible standards.

The works were all completed without affecting the operating facilities of the Palace or the surrounding area or site.

This beautiful location was reinstated and left “as if we had never been there” and was praised by the Palace as being “extremely satisfied”.